Action scheduled
Plastic drop kerb ramps
Reported via mobile in the Other street defect category anonymously at 11:53, Friday 26 June 2026
Sent to London Borough of Bexley less than a minute later. Report ref: 9687432.
Outside number two The vyne Bexleyheath they have bolted plastic drop kerb ramps in road instead of getting a dropped kerb this is not fair on those residents that have to spend thousands on having one fitted also they are a danger to car wheels a they stick out in the road.
Updates
-
State changed to: Investigating
Posted by London Borough of Bexley at 11:56, Friday 26 June 2026
-
The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:
• Carrying out enforcement noticing/investigations that are restricted by set timescales
• Monitor for misuse or gather evidence
• Monitor in heavy rainfall
• Monitor Contractor performance
• Requires reinspection after other internal/external involvementA future update will be provided once a reinspection or additional work has been carried out,
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 15:13, Thursday 2 July 2026
Only the original reporter may leave updates. If you made the original report please log in to leave an update.