Action scheduled
Kerb stone on the left side of Lodge Lane by the A2 Danson Interchange by the roundabout is loose and looks to have been dislodged and flicked a third of the way into the slip road into the A2 which the markings are still in the road for. The kerb stone has now been put against the railings are requires repairing urgently as this is a hazard to other drivers.
Reported via desktop in the Damage to kerb category anonymously at 12:32, Monday 14 April 2025
Sent to London Borough of Bexley less than a minute later. Report ref: 7432628.
Kerb stone on the left side of Lodge Lane by the A2 Danson Interchange by the roundabout is loose and looks to have been dislodged and flicked a third of the way into the slip road into the A2 which the markings are still in the road for. This has caused severe exhaust and wheel damage to resident's car, The kerb stone has now been put against the railings are requires repairing urgently as this is a hazard to other drivers.
Updates
-
State changed to: Investigating
Posted by London Borough of Bexley at 14:06, Monday 14 April 2025
-
State changed to: Open
Updated by London Borough of Bexley at 13:08, Thursday
-
This case has been referred to the Council’s contractor and will be completed within the Council’s contractual service level arrangements.
We will update the case once it has been completed.
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 13:08, Thursday
Only the original reporter may leave updates. If you made the original report please log in to leave an update.