You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Blocked Drain.

Reported via mobile in the Blocked rainwater gulleys category anonymously at 13:03, Thu 26 December 2024

Sent to London Borough of Bexley less than a minute later. Report ref: 6899310.

When it rains, (does not need to be heavy rain). Lane 1 towards Plumstead floods. The resulting lake of water and vehicles driving though the water, is washing away the raised bank. Half the bank has gone already. Shortly the bank will be completely washed away. This flooding is on a bend, so vehicles traveling at 50mph don't see it till the last minute and then swerve to miss it. This swerving into traffic in lane 2, is dangerous. If you can't repair the blocked drains. Could Bexley not cut a hole through the bank for the water to run away like Bexley did by the off rump at the elevated roundabout.

Updates

  • This case is currently being investigated.

    Further updates will follow.

    View Our Response Times

    State changed to: Investigating

    Posted by London Borough of Bexley at 08:22, Mon 30 December 2024

  • The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:

    • Carrying out enforcement noticing/investigations that are restricted by set timescales
    • Monitor for misuse or gather evidence
    • Monitor in heavy rainfall
    • Monitor Contractor performance
    • Requires reinspection after other internal/external involvement

    A future update will be provided once a reinspection or additional work has been carried out,

    Thank you for reporting this matter.

    State changed to: Action scheduled

    Posted by London Borough of Bexley at 12:42, Monday 6 January 2025

Only the original reporter may leave updates. If you made the original report please log in to leave an update.