Closed
Blocked gullies on Bexley Lane
Reported via mobile in the Blocked rainwater gulleys category anonymously at 17:52, Tue 25 June 2024
Sent to London Borough of Bexley less than a minute later. Report ref: 6154020.
Surface water gullies have been blocked on Bexley Lane for 6 months with gully pots to carrier main likely to be Borough of Bexley assets, not Thames Water. When it rains, the entire side of Bexley Lane floods causing issues for cars parked and pedestrians crossing the road. There is a constant slurry of silt and organic waste that is unable to find its way to the sewer network due to the heavily blocked drainage on Bexley Lane. This is unacceptable and needs to be fixed.
Updates
-
State changed to: Investigating
Posted by London Borough of Bexley at 09:34, Wed 26 June 2024
-
The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:
• Carrying out enforcement noticing/investigations that are restricted by set timescales
• Monitor for misuse or gather evidence
• Monitor in heavy rainfall
• Monitor Contractor performance
• Requires reinspection after other internal/external involvementA future update will be provided once a reinspection or additional work has been carried out,
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 08:15, Thu 8 August 2024
-
Following further investigations, we can confirm that the issue identified in this report does not currently exceed the Council's threshold where further action would be required at this stage. Further information on these guidelines can be found on our website:
Highways Service Level Agreements
We will continue to monitor the situation and take the necessary steps if and when the issue does meet the Councils requirements for action.
If you feel the problem deteriorates or requires further investigation in the future, please let us know.
We thank you for reporting this matter for our attention.
State changed to: No further action
Posted by London Borough of Bexley at 17:08, Thursday 9 January 2025
This report is now closed to updates from the public. You can make a new report in the same location.