You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Road surface breaking up

Reported via mobile in the Damaged road category anonymously at 22:19, Monday 1 January 2024

Sent to London Borough of Bexley less than a minute later. Report ref: 5375652.

Pothole is quickly growing due to the large vehicles tramping along this rat race. A larger area surrounding the pothole is starting to crack / sink and will also fail in the near future.

Due to the size and speed of vehicles using this road this is causing serious vibrations through my home.

Please can this larger area be inspected / repaired asap.

Thanks

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This case is currently being investigated.

    Further updates will follow.

    View Our Response Times

    State changed to: Investigating

    Posted by London Borough of Bexley at 08:33, Tuesday 2 January 2024

  • This case has been referred to the Council’s contractor and will be completed within the Council’s contractual service level arrangements.

    We will update the case once it has been completed.

    Thank you for reporting this matter.

    State changed to: Action scheduled

    Posted by London Borough of Bexley at 12:30, Tuesday 9 January 2024

  • Still open, via questionnaire, 11:14, Saturday 3 February 2024

  • After initial report raised a temporary repair was carried out. Please provide an update on what action is scheduled to repair this section of road and a timeline as another hole has now appeared in same section that was reported . Thanks.

    Posted anonymously by a non-staff user at 19:58, Monday 19 February 2024

  • This case is currently being investigated.

    Further updates will follow.

    View Our Response Times

    State changed to: Investigating

    Posted by London Borough of Bexley at 08:29, Tuesday 20 February 2024

  • The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:

    • Carrying out enforcement noticing/investigations that are restricted by set timescales
    • Monitor for misuse or gather evidence
    • Monitor in heavy rainfall
    • Monitor Contractor performance
    • Requires reinspection after other internal/external involvement

    A future update will be provided once a reinspection or additional work has been carried out,

    Thank you for reporting this matter.

    State changed to: Action scheduled

    Posted by London Borough of Bexley at 12:43, Thursday 22 February 2024

  • Still open, via questionnaire, 21:57, Sunday 3 March 2024

  • The temp repairs have failed again. This need addressing asap.

    Please can an update be provided on what long term action is being arrange/taken to fix this failing segment of road.

    Posted anonymously by a non-staff user at 20:21, Monday 25 March 2024

  • This case is currently being investigated.

    Further updates will follow.

    View Our Response Times

    State changed to: Investigating

    Posted by London Borough of Bexley at 08:16, Tuesday 26 March 2024

  • Still open, via questionnaire, 00:34, Monday 1 April 2024

  • The case has been resolved.

    Thank you for reporting this matter.

    State changed to: Fixed

    Posted by London Borough of Bexley at 16:27, Friday 5 April 2024

This report is now closed to updates from the public. You can make a new report in the same location.