The road surface camber is incorrect

Reported via mobile in the Flooding in the road category anonymously at 21:31, Wed 1 November 2023

Sent to London Borough of Bexley less than a minute later. Report ref: 5164146.

The road surface camber is incorrect and there is also a raised area, so that the excess water is unable to drain off into the near by drain. This will become lethal if and when the temperature drops and it freezes. Danger to vulnerable road users and vehicles.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This case is currently being investigated.

    Further updates will follow.

    View Our Response Times

    State changed to: Investigating

    Posted by London Borough of Bexley at 07:46, Thu 2 November 2023

  • This problem needs to be fixed, I am aware that Thames Water have been out due to a suspected leak. The water in my photo is rain water that has collected and not drained away due to the fact that the camber of the road is incorrect and that there is an incline so that the water doesn't drain away into the drain. This is now lethal due to the freezing conditions, A slip hazard for pedestrians and a slip collison for vehicles. Potential for a fatal accident

    Posted anonymously by a non-staff user at 06:18, Thu 30 November 2023
    Still open, via questionnaire

  • The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:

    • Carrying out enforcement noticing/investigations that are restricted by set timescales
    • Monitor for misuse or gather evidence
    • Monitor in heavy rainfall
    • Monitor Contractor performance
    • Requires reinspection after other internal/external involvement

    A future update will be provided once a reinspection or additional work has been carried out,

    Thank you for reporting this matter.

    State changed to: Action scheduled

    Posted by London Borough of Bexley at 10:24, Mon 11 December 2023

  • The report has been inspected by a member of the Highways Team. There will be no further action due to one of the following:

    The issue does not meet the guidelines for repair at the moment.

    The issue will be fixed as part of our normal maintenance programme.

    We have already fixed this issue.

    Thank you for reporting this matter.

    State changed to: No further action