Tarmac crossover from pavement to road has subsided
Reported via desktop in the Damaged pavement category anonymously at 09:19, Mon 27 March 2023
Sent to London Borough of Bexley 35 minutes later. Report ref: 4362410.
There has been a gradual subsidence of the tarmac sloped verge crossing outside 40 St James Way. Serious cracks have now appeared. Cars have grounded as a result of the subsidence.
Updates
-
Still open, via questionnaire, 10:07, Mon 24 April 2023
-
Still open, via questionnaire, 14:55, Mon 22 May 2023
-
The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:
• Carrying out enforcement noticing/investigations that are restricted by set timescales
• Monitor for misuse or gather evidence
• Monitor in heavy rainfall
• Monitor Contractor performance
• Requires reinspection after other internal/external involvementA future update will be provided once a reinspection or additional work has been carried out,
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 20:42, Fri 16 June 2023
-
Still open, via questionnaire, 20:10, Mon 19 June 2023
-
Still open, via questionnaire, 23:31, Mon 17 July 2023
-
State changed to: Investigating
Posted by London Borough of Bexley at 09:52, Mon 25 September 2023
-
The original issue has been addressed to a degree. However, when replacing the crossover kerb, tarmac has been filled in between the kerb and the road thereby levelling the road with the top of the kerb. This will exacerbate the existing flooding problem during heavy rain when excess surface water from the North Cray Road flows into St James Way and overflows onto my drive. I have raised this problem at various times, but to no avail. Also, rather than the repair the complete drive an unsightly patching has taken place with no effort made to define the edge of the tarmac with the grass verge.
State changed to: Action scheduled
Posted anonymously by a non-staff user at 09:52, Mon 25 September 2023
-
The report has been inspected by a member of the Highways Team . The inspection concluded that the fault identified within this report does not require further action as it does not meet guidelines where further action or repairs are required at this stage.
Highways Service Level Agreements
Thank you for reporting this matter.
State changed to: No further action
Posted by London Borough of Bexley at 17:09, Mon 25 September 2023
This report is now closed to updates from the public. You can make a new report in the same location.