You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Back to all reports

There is a lengthy there is a huge crack on the road that is getting bigger and my car went over it and disabled my car broke the surpenstion on my car since this has occurredi have noticed that the cracks! Are getting bigger and are now look like the road is going to full in to the ground . I believe this should be looked at as a priority as other drivers and people are at risk . Including my mother drive front garden . As for my car I also think you you pay for the damaged that has occurred. Right out side 51 laysdown avenue bexleyheath

Reported via mobile in the Damaged road category anonymously at 14:05, Saturday 18 February 2023

Sent to London Borough of Bexley less than a minute later. Report ref: 4242232.

I became aware of this when my car went over a thud it has now gotten much bigger and is a hazard.

I believe it's going to sink.

My mother is disabled and lives where the problem is .

Top of Laysdown avenue bexleyheath DA7 6AZ area / out side property 51 53 55 57 between braemar Avenue laysdown avenue.

I became aware on the 28th of December 2022 when my car felt the thud and took my car off the road and noticed it has gotten much bigger in diameter since 14th February 2023.

It is detieriating very quickly and now exceeding on to the path way .

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This case is currently being investigated.

    Further updates will follow.

    View Our Response Times

    State changed to: Investigating

    Posted by London Borough of Bexley at 08:48, Monday 20 February 2023

  • The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:

    • Carrying out enforcement noticing/investigations that are restricted by set timescales
    • Monitor for misuse or gather evidence
    • Monitor in heavy rainfall
    • Monitor Contractor performance
    • Requires reinspection after other internal/external involvement

    A future update will be provided once a reinspection or additional work has been carried out,

    Thank you for reporting this matter.

    State changed to: Action scheduled

    Posted by London Borough of Bexley at 15:42, Friday 17 March 2023

  • Still open, via questionnaire, 20:35, Tuesday

Only the original reporter may leave updates. If you made the original report please log in to leave an update.