report here Reposition
report here
In progress
Pavement surface disturbed by something removed - uneven with need to level up oblong hole to pavement level
Reported via desktop in the Damaged pavement category anonymously at 16:48, Tuesday 31 January 2023
Sent to London Borough of Bexley less than a minute later. Report ref: 4190339.
Pavement surface disturbed by something removed - uneven with need to level up oblong hole to pavement level
This on the pavement by the bus stop C Blackfen Road / Westwood Lane towards Bexley outside Blackfen Express Dry Cleaners 11 Wellington Parade Blackfen Road.
Clearly seen in this view:
Https://www.instantstreetview.com/@51.450465,0.104282,316.91h,-21.79p,2.67z,7FYZS4iM_NKpJhQidUnR0g
Thank you
Updates
-
State changed to: Investigating
Posted by London Borough of Bexley at 07:00, Wednesday 1 February 2023
-
The reported issue requires further investigations or work by our Highways Technicians to resolve, which may include any of the following:
• Carrying out enforcement noticing/investigations that are restricted by set timescales
• Monitor for misuse or gather evidence
• Monitor in heavy rainfall
• Monitor Contractor performance
• Requires reinspection after other internal/external involvementA future update will be provided once a reinspection or additional work has been carried out,
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 01:43, Friday 3 February 2023
-
Not fully fixed when last checked a week ago. The square uneven pavement surface by the kerb was not fixed.
Posted anonymously by a non-staff user at 17:10, Tuesday 28 February 2023
Still open, via questionnaire -
State changed to: Investigating
Posted by London Borough of Bexley at 08:27, Wednesday 1 March 2023
-
This case has been referred to the Council’s contractor and will be completed within the Council’s contractual service level arrangements.
We will update the case once it has been completed.
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 00:01, Monday 6 March 2023
-
An inspection last night and no progress here.
Posted anonymously by a non-staff user at 20:57, Saturday 1 April 2023
Still open, via questionnaire -
State changed to: Investigating
Posted by London Borough of Bexley at 08:49, Wednesday 10 May 2023
-
This case has been referred to the Council’s contractor and will be completed within the Council’s contractual service level arrangements.
We will update the case once it has been completed.
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 13:46, Monday 15 May 2023