Drainage channel between grass verge and pavement from18 - 8 lesney Park

Reported via desktop in the Blocked rainwater gulleys category anonymously at 10:26, Tue 2 November 2021

Sent to London Borough of Bexley less than a minute later. Report ref: 3099309.

The drainage channel between grass verge and pavement from18 - 8 lesney Park needs clearing out because when it rains the water floods along the footpath into the front gardens and travels into the residents' back gardens. Please can the drainage channels be cleared out. It is completely overgrown with grass and needs digging out.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This case is currently being investigated.

    Further updates will follow.

    State changed to: Investigating

    Posted by London Borough of Bexley at 07:42, Wed 3 November 2021

  • This case has been referred to the Council’s contractor and will be completed within the Council’s contractual service level arrangements.

    We will update the case once it has been completed.

    Thank you for reporting this matter.

    State changed to: Action scheduled

    Posted by London Borough of Bexley at 07:42, Wed 3 November 2021

  • The reported issue requires further evidence or investigation, and as such will be monitored by our Highways Technicians.

    A re-inspection has been scheduled for a future date, which will determine if any action will be undertaken.

    Thank you for reporting this matter.

    Posted by London Borough of Bexley at 17:08, Wed 3 November 2021

  • Still open, via questionnaire, 11:08, Tue 30 November 2021

  • The report has been inspected by a member of the Highways Team . The inspection concluded that the fault
    identified within this report does not require further action due to the following:

    Does not meet guidelines where further action or repairs are required at this stage.

    The gully / flooded area will be cleared as part of the Council’s regularly scheduled street cleansing or gully cleansing programme.

    The issues has been resolved as part of a previous report.

    Thank you for reporting this matter.

    State changed to: No further action

    Posted by London Borough of Bexley at 09:21, Wednesday 12 January 2022